Sunday 22 February 2015

(Dash) Lights…(My) Camera…(In)Action….

…for now at least.  The wiring is moving at a pace thanks to my brother-in-law Leon…a completely new loom is taking shape with wires that match the colours on a great A3 sized Guzzi wiring diagram I have compared with the random colours used in the botched loom. 

20150220_194118 20150220_203618

20150220_203959

This is where the main loom joints together front to rear…

IMG-20150218-WA0002   IMG-20150212-WA0002

…some tidying required around the back of the headlight bowl as this is temporary to check that everything works…

IMG-20150222-WA0002

…which it does!  This is an Osram Nightbreaker bulb and is brilliantly bright.

IMG-20150218-WA0001 IMG-20150218-WA0000

The dash is coming on also…the clocks are back lit but are quite dim so will look at changing them to LED’s if possible.

20150220_194127

The dash LED’s are are super bright, particularly the High Beam.  Both the indicator dash lights are working and the Neutral light leaving only the Ignition/Charge light to wire in.  The front indicators, with their LED’s are working just fine…

 IMG-20150222-WA0000 

…leaving the rear Stop/Tail light and the rear indicators to wire in and that should just be about it for the wiring loom.  It will then be wrapped in fabric wiring tape to keep it all neat and tidy as well as protected from moisture and grime.

IMG-20150222-WA0003

One of the jobs left to do is to de-link the brakes as I mentioned in a previous blog.  So the nice people at HEL made me a brake line up that would do the job…except for the fact I forgot to specify a 90° bend in one of the unions…doh!  So I have now ordered another brake line but this time from Venhill (remembering the 90° bend!) whose unions are screwed onto the braided line rather than swaged on like the HEL ones meaning they cannot be removed successfully by someone at home.

Jobs to do…

  • Fit the brake line when it arrives and put fluid into the braking system and bleed.
  • Balance the carburettors.
  • Check the nearside fork seal, as it wept when tied down on the trailer…too much compression!
  • Commission a new seat for the old seat pan…below is my preferred option seeing as I cannot go Street Tracker with it due to the tyre cut out in the seat pan…safety over aesthetics.  I have ordered a 20cm square of race seat foam that I will stick to the bare seat pan to get it to the MOT (Ministry of Transport) safety testing station.

brown hump

  • Check all nuts and bolts…add medium strength thread-lock, then torque tight.
  • Bin the current fuel pipes with their crossover and run a single fuel hose from each carburettor to each fuel tank tap.
  • Take it for its MOT test…job done.

No comments:

Post a Comment